Jump to content

Barking station

Coordinates: 51°32′21″N 0°04′54″E / 51.5393°N 0.0817°E / 51.5393; 0.0817
From Wikipedia, the free encyclopedia
(Redirected from Barking railway station)

Barking London Underground London Overground National Rail
The station forecourt in 2004
Barking is located in Greater London
Barking
Barking
Location of Barking in Greater London
LocationBarking
Local authorityLondon Borough of Barking and Dagenham
Managed byc2c
OwnerNetwork Rail
Station code(s)BKG
DfT categoryB
Number of platforms9 (facing 8 tracks)
AccessibleYes[1][2]
Fare zone4
London Underground annual entry and exit
2019Increase 18.13 million[3]
2020Decrease 14.29 million[4]
2021Decrease 9.27 million[5]
2022Increase 14.56 million[6]
2023Increase 15.14 million[7]
National Rail annual entry and exit
2018–19Increase 14.452 million[8]
– interchange Increase 0.822 million[8]
2019–20Decrease 13.831 million[8]
– interchange Decrease 0.627 million[8]
2020–21Decrease 6.743 million[8]
– interchange Decrease 0.263 million[8]
2021–22Increase 5.982 million[8]
– interchange Increase 1.500 million[8]
2022–23Increase 12.730 million[8]
– interchange Decrease 0.746 million[8]
Railway companies
Original companyLondon, Tilbury and Southend Railway
Pre-groupingMidland Railway
Post-groupingLondon, Midland and Scottish Railway
Key dates
13 April 1854 (13 April 1854)Opened by LT&SR
1902District line started
1905District withdrawn
1908District line restarted
Listed status
Listed featureBooking hall
Listing gradeII
Entry number1242678[9]
Added to list24 November 1995
Other information
External links
Coordinates51°32′21″N 0°04′54″E / 51.5393°N 0.0817°E / 51.5393; 0.0817
London transport portal

Barking is an interchange station serving the town of Barking, east London. It is served by London Underground, London Overground and National Rail main line services. It is located on Station Parade, in the town centre.

On the Underground it is a stop on the District line and is also the eastern terminus of the Hammersmith & City line; on the National Rail network it is served by c2c services operating to and from Fenchurch Street; and on the Overground it was formerly the eastern terminus of the Gospel Oak to Barking line, which has now been extended to Barking Riverside. There is also interchange with London Buses and East London Transit routes on the station frontage. The Underground station is the busiest in the network outside of Zones 1 and 2.

The station was opened in 1854 by the London, Tilbury and Southend Railway as one of the first stations on the route. It was rebuilt in 1908 and again in 1959. As of June 2023, significant redevelopment of the station is ongoing.

History

[edit]

Pre-grouping (1854–1922)

[edit]

The station was opened as part of the London, Tilbury and Southend Railway (LT&SR)'s new line which left the Eastern Counties Railway's (ECR) main line at a new junction at Forest Gate. Two separate LT&SR trains from London started at Fenchurch Street and Shoreditch and were combined at Stratford for the journey to Tilbury (and split at Stratford in the opposite direction). Barking at this time was a small village and the original station was a two platformed affair which opened on 13 April 1854. Congestion at Stratford and deteriorating relationships between the lessees running the LT&SR and the Eastern Counties Railway saw a new route built between Barking and Gas Factory Junction where the new route joined the London & Blackwall Extension Railway, opening in 1858. Other than a new junction west of Barking (and west of the River Roding bridge) no changes were made at Barking and the original Forest Gate Junction section was then used by a goods trains and a rump Bishopsgate to Barking service operated by the ECR and after 1862 by the Great Eastern Railway.

Between the River Roding and the station there was a level crossing at Tanner Street and one on East Street at the east end of the station. Around 1860 some coal sidings were laid on the south side of the line west of the station.

The new Pitsea direct route opened in stages first to Upminster (1885), East Horndon (1886) and finally joining the existing Southend route at Pitsea in 1888. A new junction was provided 200 yards east of Barking station and this was controlled by a new signal box called Barking East Junction. The former Barking Junction box to the west was renamed Barking West Junction.

This station lasted until the 1880s when increasing passenger and goods traffic as well as issues with the level crossings at Barking (which was expanding) meant something needed to be done. [10]

1889 rebuilding

[edit]

The changes for the 1889 rebuilding were:

  • An additional through platform on the down side of the station to allow the GE Liverpool Street service to run round away from the through platforms.
  • The two existing platforms were extended to accommodate longer trains
  • An up bay platform for departing services only
  • New station building
  • New cattle dock

No changes were made to level crossing arrangements despite increasing usage, although a number of minor foot crossings were closed in 1900/1901.

The rebuilding was in advance of the arrival in Barking of services from the Tottenham and Forest Gate Railway (T&FGR) which opened in July 1894. Although a joint venture between the LT&SR and Midland Railway the majority of the services were operated by the latter company. [10]

Developments 1902–1908

[edit]

Around the turn of the century Barking Town Urban District Council were seriously concerned about the amount of time that East Street Gates were closed to road traffic. In 1902, the LT&SR assisted when it made some minor changes to the signalling arrangements, and these were a prelude to further changes in the area. A new bridge over the River Roding was opened in 1900 and the original river bridge was replaced in 1903. The new scheme saw the Great Eastern/T&FGR trains operating over the northern lines and the LT&SR trains on the southern lines.

At the same time, the Whitechapel and Bow Railway (a joint LT&SR/District Railway venture) was being built and when it opened, frequent District Line trains worked through to East Ham with a few extended through to Upminster. All trains were steam operated at this time. The downturn in LT&SR performance (and the upturn in Southend commuter traffic) saw the line from Bromley to East Ham quadrupled and electrified with electric District Line services terminating at East Ham from 1905.

The Little Ilford area to the west of the Rover Roding was developed between 1902 and 1908, and additional tracks extended to Barking (so there were now three pairs of tracks across the River Roding). The District Line electric services were now extended from East Ham and terminated at Barking (although a few steam worked District Line services worked through to Southend).

By this time, the LT&SR, which had previously been resistant to closing the level crossing on East Street finally saw the need for a bridge and this was a key part of the rebuild. The station itself now consisted of eight platforms which by use were:

Barking station platform use 1910
Platform Main Traffic Other Remarks
1 Terminating trains from T&FG line
2 Down trains from T& FG line Mostly goods trains – electrified for District Line trains in 1911
3 Up trains to T& FG Mostly goods trains - electrified for District Line trains in 1911
4 District line Electrified – services in 4 and 5 terminated.
5 District line Electrified – two sidings east of here existed for reversing trains
6 LT&SR Down Line Services from Fenchurch Street to Southend & Tilbury (part of 1889 station)
7 LT&SR Up line Services from Southend & Tilbury to Fenchurch Street (part of 1889 station)
8 LT&SR Up line Services from Southend & Tilbury to Fenchurch Street (part of 1889 station)

There was also an Up Rippleside Loop line for goods traffic and the goods yard was rebuilt west of the station.

Full District Line electric services to Barking commenced on 1 April 1908 and platforms 2 and 3 were electrified in 1911. The following year in 1912 the LT&SR was taken over by the Midland Railway and following the 1921 Grouping Act that became part of the London, Midland and Scottish Railway.[11][12]

London Midland & Scottish Railway (1923–1947)

[edit]

The LMS and District Railway looked at an electrified extension to Upminster which involved new stations and an additional set of tracks with some changes to the east end of Barking station. The new section opened on 12 September 1932, and four years later the Metropolitan line started operating through Barking to Upminster as well.[13] During the Second World War Barking station was damaged by bombs in the blitz. The main incidents included:

Date Remarks
7 September 1940 Debris and minor direct damage
12 September 1940 Bomb at Barking station - all lines blocked
20 October 1940 Bombs on Barking to Upminster section - LT services suspended
25 October 1940 Bombs on Local Lines - LT services suspended

[14]

British Railways (1948–1994)

[edit]

The railways were nationalised on 1 January 1948, and Barking became a London Midland Region station for a brief period before transferring, along with the rest of the former LTS lines, to the Eastern Region on 20 February 1949.

In the early 1950s a major programme of works for the whole LTS line was developed consisting of:

  • Electrification and re-signalling of the LTSR
  • complete operational separation of the LTSR and District Line
  • Simplification of freight operations centred on at Ripple Lane Marshalling Yard
  • The rebuilding of Barking Station with a flyover for freight trains and cross platform interchange between underground and Southend line services. In order to improve the passenger interchange between District Line and British Rail (and vice versa) a dive-under was provided to the east of Barking and a second flyover to the west.

This work was delivered in the late 1950s and early 1960s, and from June 1962 all passenger services were worked by Class 302 Electric Multiple Units.

The station booking hall was completely rebuilt between 1959 and 1961 to designs by architect H. H. Powell[9] with Project architect John Ward of British Railways Eastern Region Architect's Department.[15] Nikolaus Pevsner stated it was "erected to coincide with electrification of the railway" and that "it is commensurately modern in outlook and unquestionably one of the best English stations of this date". The station was reopened by the Queen in 1961.[16] It is now a Grade II listed building.[17]

The LTS line and Barking station became part of the London and South Eastern sector of British Rail in 1982, and in June 1986 this was rebranded as Network South East (NSE). With the Conservative government of the early 1990s looking to privatise the railways, the operation of the NSE passenger train service was put under the control of a Train Operating Unit.

The privatisation era (1994–present)

[edit]

The LTS line was privatised in May 1996, with a new company called LTS Rail (owned by Prism Rail) taking over operations of the services through Barking station. The owners of Prism Rail were bought out by National Express in 2000, and the line re-branded C2C. C2C was later bought out by Trenitalia who run the station today.

The infrastructure was initially run by Railtrack from 1994, but that company failed and was rescued by the government in 2001. A new company called Network Rail was formed to maintain the infrastructure.

Accidents and incidents

[edit]
  • In November 1923, a locomotive crashed through buffers at Barking and overturned, overhanging the road below.[18]

Design

[edit]

The station has four sets of stairs from the platforms to the overbridge and the booking hall. Four ramps connected by a subway give step free access between all the platforms. The stairs/ramps access platforms: i) 1/1a, ii) 2/3/4, iii) 5/6, and iv) 7/8. There is a lift between the booking hall and platforms 1/1a. This station has two bay platforms (no 1 and 3). Platform 1 was the terminal platform for the Gospel Oak to Barking line, before the line's extension to Barking Riverside, and only used to be used by London Overground services. It was electrified in 2017 ready for the planned introduction of electric trains in 2018. Platform 3 is used by some LU trains on both lines that serve the station, but mainly the District line.

The ticket office is managed by c2c and has two serving windows (as at 2024, with redevelopment work still ongoing.) Tickets are available for National Rail, as well as London Underground. Oyster cards can also be issued at the ticket office. There are six self-service ticket machines, which can issue tickets ordered on line (Tickets on Demand or 'TOD'). and sell Oyster products. (The four Shere Fastticket machines still on site as at 25 April 2018 have been taken out of service with effect from 1 April 2018, according to a sign posted on them.) Seven ticket barriers and a wide ticket gate control access to all platforms. There are sidings to the east which were built to accommodate D stock, C stock and S stock, though from 2017 only S stock is in service on the route. [Ticket machine info now out of date].

To the west of the station there are two railway overbridges. The westernmost carries the NR tracks to and from platforms 7 and 8 over the four tracks to and from platforms 2–6 to join the tracks to and from Woodgrange Park and beyond, facilitating c2c services to serve Stratford and Liverpool Street and, since July 2022, the London Overground extension to Barking Riverside.

The easternmost bridge carries the westbound Underground tracks from platform 6 over the NR tracks to and from platforms 4 and 5 to the southern side of the LU tracks from platform 2. This enables eastbound cross platform changes between LU trains on platform 2 and NR trains on platform 4.

To the east of the station a subway reverses the effect of the above bridge. This enables westbound cross platform changes between LU trains on platform 6 and NR trains on platform 5.

Barking station platform use as of 2023
Platform no Stairs/ramp Services Notes
1 (i) London Overground terminus Bay platform infrequently used.
1a (i) District line eastbound Opposite face of platform 1. See platform 2.
2 (ii) District line eastbound Also used by some terminating Underground trains. On eastbound District line trains (but not terminating trains) the doors open onto both platform 2 and 1a.
3 (ii) Underground terminus Bay platform used mostly by some terminating District line and, infrequently, Hammersmith and City line trains.
4 (ii) c2c eastbound via Upminster
5 (iii) c2c westbound to Fenchurch Street
6 (iii) District line/Hammersmith and City line westbound
7 (iv) London Overground to Barking Riverside/c2c eastbound via Rainham/Upminster
8 (iv) London Overground to Gospel Oak/c2c westbound to Fenchurch Street/Liverpool Street

The stairs/ramp numbers are for clarity in this article; not in actual use.

Redevelopment

[edit]

Barking and Dagenham London Borough Council has developed a Barking Station Masterplan for the redevelopment of the station, including the removal of retail units from the station concourse, expansion of ticket barriers, additional Oyster card machines, and new building work to provide replacement retail and to increase natural light within the station.[19] In 2009, the station was identified as one of the ten worst category B interchange stations for mystery shopper assessment of fabric and environment, and it was planned to receive a share of £50m funding for improvements.[20]

As part of the 2011 renewal of the Essex Thameside franchise it was proposed that ownership of the station could transfer to Transport for London.[21] Following the 2010 general election the funding for planned works was withdrawn and the 2011 franchise renewal delayed until 2013. The new franchise invitation to tender proposes the transfer of building maintenance from Network Rail to the new operator, and includes an option to complete the redevelopment works. In 2012, the public space outside the station on Station Parade was re-ordered and repaved, using funding from Transport for London.[22]

Services

[edit]
London Overground four-coach Class 378, in service until August 2019
Class 710 four-coach electric train replacing the Class 378 units
c2c Class 357

On the Underground, it is served by the District and Hammersmith & City (and two early morning Circle line services) lines and forms the eastern terminus for the Hammersmith & City whilst District line services continue eastward to Upminster. The station is also served by National Rail (c2c) and London Overground services.

  • London Underground: Some LU services run to/from "the bay road" (platform 3). Most Hammersmith and City line trains run directly to/from the sidings to the east where some trains are stabled overnight, and therefore use through platforms 2 and 6. S7 stock trains have seen regular service to Barking since 9 December 2012.
  • If travelling west by Underground, it is usually best to take the first train from platform 6 and change west of Plaistow as necessary (the last opportunity to change between the District and Hammersmith & City lines being Aldgate East). Not only does this avoid the walk to the bay road at Barking, but it also may allow connecting with a train that starts at Plaistow, where there is a bay road used to terminate eastbound trains short, to recover time or for other operational expediency.
  • London Overground trains on the Gospel Oak to Barking line have used platforms 7 and 8 since the extension to Barking Riverside opened in July 2022. Class 710 electric trains are running here, replacing Class 378 electric trains borrowed from other Overground lines after electrification.

Westbound

[edit]

The typical off-peak Monday to Friday trains per hour (tph) service is:

Eastbound

[edit]
  • 12 tph to Upminster (District line). Platform 2 (and doors also open to 1a). [24]
  • 4 tph to Shoeburyness via Basildon (2 tph all stations and 2 tph semi-fast) (c2c). Platform 4. [23]
  • 2 tph to Grays via Rainham (c2c). Platform 7.
  • 2 tph to Southend Central via Ockendon (c2c). Platform 4.
  • 4 tph to Barking Riverside (London Overground). Platform 8
  • 6 tph terminating here (Hammersmith and City line).[25] Nearly all platform 2.
  • 3 tph terminating here (District line). Platforms 2 & 3.

Connections

[edit]

London Buses routes 5, 62, 169, 238, 287, 366, 368, EL1, EL2, EL3, SL2, school route 687 and night route N15 serve the station.[26]

Preceding station London Underground Following station
East Ham District line
Upney
towards Upminster
East Ham
towards Hammersmith
Hammersmith & City line Terminus
Preceding station London Overground Following station
Woodgrange Park
towards Gospel Oak
Suffragette line
Gospel Oak to Barking line
Barking Riverside
Terminus
Preceding station National Rail National Rail Following station
West Ham   c2c
London, Tilbury and Southend line
  Upminster
    Dagenham Dock
c2c
Connection to Great Eastern Main Line
(Limited services)

References

[edit]
  1. ^ "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
  2. ^ "London and South East" (PDF). National Rail. September 2006. Archived from the original (PDF) on 6 March 2009.
  3. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
  4. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
  5. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
  6. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
  7. ^ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2023. Transport for London. 8 August 2024. Retrieved 16 September 2024.
  8. ^ a b c d e f g h i j "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
  9. ^ a b Historic England. "Barking Station booking hall (1242678)". National Heritage List for England. Retrieved 9 March 2019.
  10. ^ a b Kay, Peter (2019). The London, Tilbury & Southend Railway - a history of the company and line Volume 7. Wivenhoe, UK: Peter Kay. pp. 572–576. ISBN 978-1-899890-51-4.
  11. ^ Kay, Peter (1997). The London, Tilbury and Southend Railway: A history of the company and line, Volume 2 1893–1912. Teignmouth, UK: Peter Kay. pp. 109, 110. ISBN 1-899890-19-X.
  12. ^ Kay, Peter (2019). The London, Tilbury & Southend Railway – a history of the company and line Volume 7. Wivenhoe, UK: Peter Kay. pp. 576–585. ISBN 978-1-899890-51-4.
  13. ^ Kay, Peter (2019). The London, Tilbury & Southend Railway - a history of the company and line Volume 7. Wivenhoe, UK: Peter Kay. p. 586. ISBN 978-1-899890-51-4.
  14. ^ Kay, Peter (2015). The London, Tilbury & Southend Railway - a history of the company and line Volume 4. Wivenhoe, UK: Peter Kay. p. 245. ISBN 978-1-899890-47-7.
  15. ^ Lawrence, David (2018). British Rail Architecture 1948-97. Crecy Publishing Ltd. p. 84. ISBN 9780860936855.
  16. ^ Laurence Menear (1983). London's Underground Stations: A Social and Architectural Study. Baton Transport.
  17. ^ "People, Time and Place London Borough of Barking and Dagenham Heritage Strategy" (PDF). Barking and Dagenham London Borough Council. Archived from the original (PDF) on 19 May 2005. Retrieved 17 November 2009.
  18. ^ Trevena, Arthur (1980). Trains in Trouble. Vol. 1. Redruth, UK: Atlantic Books. p. 30. ISBN 0-906899-01-X.
  19. ^ "Barking Station Masterplan Supplementary Planning Document" (PDF). Archived from the original (PDF) on 4 March 2016. Retrieved 1 December 2015.
  20. ^ "£50m revamp for 'worst stations'". BBC News. 17 November 2009. Archived from the original on 19 November 2009. Retrieved 17 November 2009.
  21. ^ "Passenger Focus' response to c2c's proposed franchise extension". Passenger Focus. Archived from the original on 29 March 2009.
  22. ^ "Barking Station forecourt improvements". Archived from the original on 30 June 2012.
  23. ^ a b "c2c Train Times" (PDF). c2c. June 2024. Retrieved 1 June 2024.
  24. ^ a b c d "District Line Working Timetable" (PDF). Transport for London. 20 May 2018. Archived from the original (PDF) on 27 July 2019. Retrieved 4 September 2020.
  25. ^ a b "Circle and Hammersmith & City Lines Working Timetable" (PDF). Transport for London. 21 May 2017. Archived from the original (PDF) on 15 June 2021. Retrieved 4 September 2020.
  26. ^ "Buses from Barking" (PDF). TfL. June 2022. Retrieved 1 August 2022.
[edit]